EIFS Installation

Insulation and finish in one wall system

EIFS (exterior insulation and finish system) combines a layer of rigid foam insulation with a reinforced base coat and acrylic finish, giving a wall better thermal performance than traditional stucco while keeping the same finished look. Dessano installs EIFS assemblies on new builds, additions, and full re-clads across Oakville and the surrounding area, using drainage-plane details suited to our climate rather than the older barrier-style systems that trap moisture against the sheathing.

Complete EIFS installation services

Insulation value, water management, finish quality.

An EIFS wall is a layered assembly, and each layer has a job. We build the drainage path first, then the insulation and reinforcement, then the finish, so the system performs the way it's designed to for years rather than just on installation day.

Insulation board and drainage plane

We fasten EPS insulation board to a water-resistive barrier with a drainage cavity behind it, so any moisture that gets past the finish coat has a path down and out instead of sitting against the sheathing. This is the detail that separates a system built for our climate from an older barrier EIFS design.

Base coat and reinforcing mesh

A base coat is troweled over the insulation board and a fiberglass reinforcing mesh is embedded into it while it's still wet. This mesh is what gives the finish impact resistance and keeps hairline cracking from telegraphing through to the surface.

Acrylic finish coat

The final finish coat goes on in the texture and colour the project calls for. Acrylic finishes flex slightly with temperature changes, which is part of why EIFS holds up well through our freeze-thaw cycles when the layers underneath are built correctly.

Why choose Dessano for EIFS installation

EIFS gets a bad reputation in some markets because older barrier systems were installed without a drainage cavity, and any water that found its way in had nowhere to go but into the wall. We build a drainage plane into every EIFS assembly we install, and we won't embed mesh into a base coat that's already started to skin over, since that weakens the bond the finish depends on. That attention at each layer is what keeps an EIFS wall performing the way it's supposed to.

When EIFS installation makes sense

Our installation process

Where we install EIFS

We install EIFS systems out of Oakville, with regular projects in Burlington, Mississauga, Etobicoke, North York, Vaughan, Richmond Hill, and Markham. Installation runs from April through December in this climate, and we handle quotes and scheduling year-round.

Common questions about EIFS installation

Yes, when it's built with a drainage cavity behind the insulation board. The moisture problems associated with EIFS in older buildings almost always trace back to barrier-style systems that had nowhere for water to go.

EIFS includes a layer of rigid foam insulation under the base coat, which gives the wall added thermal performance that traditional three-coat stucco doesn't provide on its own.

Yes, damaged sections can be cut out and rebuilt in layers to match the surrounding wall, as long as the repair follows the same drainage and reinforcement details as the original install.