Siding Installation
Cladding done right, wall to trim
Dessano Stucco Systems has been installing exterior cladding across Oakville and the GTA since 2000. Siding is only as good as the assembly behind it: a weather-resistive barrier over the sheathing, starter strip set level at the base of the wall, correct panel overlap and fastening reveal, and flashing at every window, door, and penetration so water sheds outward instead of finding a way in. We install vinyl, fiber cement, and composite systems, and we help homeowners and builders pick the material that fits the home, the budget, and how the wall is built.
Complete siding installation services
Right material, right layers, right details.
Every siding job starts with the wall assembly, not the panel colour. We build the drainage plane and trim package to suit whichever cladding is going on, since vinyl, fiber cement, and composite each fasten and finish differently.
Weather barrier, strapping, and starter course
We install a code-compliant house wrap over the sheathing, adding vertical strapping where the wall needs a rainscreen gap or a flatter nailing surface. The starter strip goes on level first, since every course above it follows that line, and a starter set out of level telegraphs up the whole wall.
Material selection and fastening
Vinyl, fiber cement, and composite panels each have their own nailing pattern, fastener spacing, and clearance requirements from grade and roofline. We match the fastening method to the material's expansion behaviour and weight so panels sit flat without buckling or pulling loose in the years that follow.
Trim, flashing, and finishing
J-channel, corner posts, and window and door trim get installed with flashing tied into the barrier underneath, not just caulked over top. Caulk is a backup, not the plan, so we detail flashing first and let it do the actual work of keeping water out.
Explore related services
Why choose Dessano for siding installation
We build the barrier and flashing details the same way regardless of which material goes over top, because that's the layer that actually keeps water out of the wall long after the finish colour has faded. Crews on our jobs don't caulk over a flashing gap to save time on a window head detail, since that's one of the more common ways a siding job leaks within a few years. We've installed enough different materials in this climate to know which fastening mistakes cause callbacks, and we build around them from the start.
When siding installation makes sense
- You're finishing new construction or an addition and need a full cladding system from bare sheathing
- You're renovating and want to switch materials, such as moving from an aging wood or aluminum exterior to vinyl or fiber cement
- Your current siding is beyond spot repair and a full new install is the more practical route
- You're adding insulation or strapping as part of the install and need the whole assembly rebuilt to accommodate it
- A designer has specified a specific material or reveal that your current contractor hasn't installed before
Our process
- Site visit to assess the wall, review material options, and discuss budget and timeline
- Written quote covering barrier, strapping, material, trim, and flashing scope
- Barrier and strapping installation, followed by starter course and panel installation in sequence
- Trim and flashing detailing, then a final walkthrough to check reveal lines and finish before we sign off
Where we install siding
We install siding for residential and commercial clients based out of Oakville, with regular work across Burlington, Mississauga, Etobicoke, North York, Vaughan, Richmond Hill, and Markham. Siding installation is seasonal work in this climate, running roughly April through December, though we handle quotes and scheduling year-round.
Common questions about siding installation
Which siding material is right for my home?
It depends on your budget, the look you want, and how much maintenance you're willing to take on. We'll walk through vinyl, fiber cement, and composite options during the site visit and give you a straight answer on what fits your project.
Do I need to replace my sheathing when installing new siding on new construction?
On new construction the sheathing is already in place and we build the barrier and cladding on top of it. We check it during the site visit and flag anything that needs attention before the barrier goes on.
How long does a full siding installation take?
It depends on the size of the home and the material chosen, since fiber cement and composite take longer to cut and fasten than vinyl. We'll give you a realistic timeline in the written quote.